Update on installation of the healing totem at NLM – 4

Last week the final concrete work was done on the plaza and supports for the totem plus the two carved benches that will be installed in October.  In the picture below you can see the pedestal on which the totem will be mounted and the bolts for fastening the benches.

A newly poured concrete plaza with a central pedestal surrounded by caution tape.

The final concrete pour is complete.

This week the riggers made an initial visit (in the rain) to inspect the plaza and review the site to determine how their equipment must be positioned.  The riggers will transfer the totem from a flatbed truck to the plaza and secure it in place. We hope for better weather when the big day comes.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s